Press Release (Dec 25,2011)
Plant Status of Fukushima Daini Nuclear Power Station(As at 3:00 pm on December 25)
On March 11 2011, turbines and reactors of Fukushima Daini Nuclear Power 
Station Units 1 to 4 (Boiling Water Reactors, rated output 1,100 Megawatts) 
that we had been constantly operating at rated thermal output were 
automatically shut down at 2:48 pm due to the Tohoku-Chihou-Taiheiyou-Oki 
Earthquake.
                                           (March 11 Previously announced)

At 7:15 am on March 15, the reactor of Unit 4 achieved cold shutdown. As a 
result, all reactors of Units 1 to 4 at Fukushima Daini Nuclear Power 
Station achieved cold shutdown.
                                           (March 15 Previously announced)

As of 3:00 pm on December 25, the reactors of Units 1 to 4 are in cold 
shutdown (please refer to the appendix).
We will continue to make our endeavors to further stabilize each plant of 
cold shutdown.

· No updates from the previous press release. 
Appendix: TEPCO Plant Status of Fukushima Daini Nuclear Power Station 
                                                         (PDF 16.1KB) 