search



Corporate Information

 
Press Release (Dec 17,2011)
Detection of radioactive materials in the soil in Fukushima Daiichi Nuclear Power Station (Continued Report 46)
As part of monitoring activity of the surrounding environment, we 
conducted an analysis of plutonium contained in the soil collected on 
March 21 and 22 at the 5 spots in Fukushima Daiichi Nuclear Power Station. 
As a result, plutonium 238, 239 and 240 were detected.
                                                    (Previously announced)

As a result of the analysis of plutonium contained in the soil collected 
on December 5, 2011 at the 3 places where we collect samples periodically, 
plutonium 238, 239 and 240 were detected as shown in attachment.

Today, we informed the Nuclear and Industrial Safety Agency and the 
government of Fukushima Prefecture of the results.

We will continuously conduct the same sampling surveys. 
Attachment: Detection of Pu in the soil in Fukushima Daiichi Nuclear Power 
                                                      Station (PDF 11.4KB) 
back to page top


to TOP