Press Release (Oct 08,2011)
Report on the Accident Operation Manuals of Units 1 to 3 at Fukushima Daiichi Nuclear Power Station (Third continued report)
We received the instruction document*1 titled "Submission request for the
report on the Accident Operation Manuals of Units 1 to 3 at Fukushima
Daiichi Nuclear Power Station" from the Nuclear and Industrial Safety
Agency (NISA) of the Ministry of Economy, Trade and Industry.
                                    (Previously announced on September 27)

Based on the instructions, we submitted a report to NISA on the Accident
Operation Manuals of Unit 1 at Fukushima Daiichi Nuclear Power Station on
September 27, and on the Accident Operation Manuals of Unit 2 and 3 at
Fukushima Daiichi Nuclear Power Station on September 28, respectively.

Further, we also received an instruction document*2 from NISA titled
"Response based on the report on the Accident Operation Manuals of Unit 1
at Fukushima Daiichi Nuclear Power Station" on September 27 and an
instruction document*3 from NISA titled "Response based on the report on
the Accident Operation Manuals of Unit 2 and 3 at Fukushima Daiichi
Nuclear Power Station" on September 28.
                                    (Previously announced on September 28)

Per the instructions on September 27, we have organized materials
regarding information contained in the Accident Operations Manual of Unit
1 at Fukushima Daiichi Nuclear Power Station that may be detrimental to
safety and reported them to NISA on October 3.
                                       (Previously announced on October 4)

Per the instructions on September 28, we have also organized materials
regarding information contained in the Accident Operations Manual of Unit
2 and Unit 3 at Fukushima Daiichi Nuclear Power Station that may be
detrimental to safety and reported them to NISA yesterday*4.

                                                                       END
*1 Instruction document
Submission request for the report on the accident operation manuals of
Units 1 to 3 at Fukushima Daiichi Nuclear Power Station
                                                (September 26, 2011, NISA)

*2 Instruction document
Response based on the report on the accident operation manuals of Unit 1
at Fukushima Daiichi Nuclear Power Station
                                                (September 27, 2011, NISA)

*3 Instruction document
Response based on the report on the accident operation manuals of Unit 2
and 3 at Fukushima Daiichi Nuclear Power Station
                                                (September 28, 2011, NISA)

*4 Extension of the deadline
The instruction document on September 28 originally instructs us to report
them to NISA before October 4.  However, we asked NISA to extend the
deadline on October 4 as we had estimated that to organize those materials
would take plenty of time.  As a result, NISA accepted our request and the
new deadline was set on October 7. 

We have provided a Japanese press release version of the instruction
document received from NISA. However, at this time we have reserved the
right not to provide an English version due to potential misunderstandings
that may arise from an inaccurate rendering of the original Japanese text.
We may provide the English translation that NISA releases in our press
releases. However, in principle we would advise you to visit the NISA
website for timely and accurate information. 