As part of monitoring activity of the surrounding environment, we
conducted an analysis of plutonium contained in the soil collected on
March 21 and 22 at the 5 spots in Fukushima Daiichi Nuclear Power Station.
As a result, plutonium 238, 239 and 240 were detected.
(Previously announced)
As a result of plutonium analysis in the soil from the samples at the 3
periodic sampling spots collected on July 11, plutonium 238, 239, and 240
were detected as shown in the attachment 1.
In addition, as a result of nuclide analysis of the gamma ray contained
in the soil, radioactive materials were detected as shown in the
attachment 2.
Today, we informed the Nuclear and Industrial Safety Agency and the
government of Fukushima Prefecture of the results.
We will continue conducting the similar analysis.
Attachment1: Fukushima Daiichi Nuclear Power Station: Plutonium analysis
result in the soil (PDF 12.7KB)
Attachment2: Result of gamma ray nuclide analysis of soil - Fukushima
Daiichi Nuclear Power Station (PDF 10.5KB)