Press Release (Jul 13,2011)
Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, July 13)
On March 11 2011, Fukushima Daini Nuclear Power Station Units 1 to 4 
(Boiling Water Reactors, rated output 1,100 Megawatts each) that we had 
been operating at rated thermal output shutdown automatically at 2:48 pm, 
due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake (previously announced 
on March 11).

At 7:15 pm on March 15, the reactor of Unit 4 achieved a cold shutdown. As 
a result, all the Units of Fukushima Daini Nuclear Power Station achieved 
the status of cold shutdown (previously announced on March 15). 

As of 3:00 pm on July 13, the Units 1 to 4 remain in a cold shutdown 
(please refer to the appendix). We will make our best efforts to stabilize 
each plant.

<New items are underlined>
Of the monitoring posts (7 in total) installed in the site boundary, we are 
planning to clean the inside of the covers that veil the measuring devices 
and the feet of the posts from July 11th to 15th in order to improve 
sensitivity for detection 
This might influence on measuring the data of the monitoring posts.

(Track Record of Cleaning Monitoring Posts)
○No. 1: July 11th From 4:05 pm to 5:15 pm
○No. 2: July 12th From 3:05 pm to 4:05 pm 