search



Corporate Information

 
Press Release (Mar 30,2011)
The results of nuclide analyses of radioactive materials in the air at the site of Fukushima Daiichi Nuclear Power Station (9th release)
On March 22nd 2011, as part of monitoring activity of the surrounding
environment, we conducted nuclide analysis of radioactive materials
contained in the air which were collected on March 20th and 21st 2011 at
the site of Fukushima Daiichi Nuclear Power Station, which was damaged by
Tohoku-Chihou-Taiheiyo-Oki Earthquake. As a result, radioactive materials
were detected as shown in the attachment. Therefore, we summarized the
results and reported them to Nuclear and Industry Safety Agency as well as 
to the government of Fukushima Prefecture today. (previously announced)

On March 28th, 2011, we conducted nuclide analysis of radioactive
materials contained in the air which were collected on the same date at
the site of Fukushima Daiichi Nuclear Power Station. As a result,
radioactive materials were detected as shown in the attachment. Therefore,
we summarized the results and reported them to Nuclear and Industry
Safety Agency as well as to the government of Fukushima Prefecture today.

We will continue the sampling survey the same as this one. 
attachment1:The result of the nuclide analysis of radioactive materials in 
            the air at the site of Fukushima Daiichi Nuclear Power Station(PDF 12.6KB) 
attachment2:The result of the nuclide analysis of radioactive materials in 
            the air at the site of Fukushima Daini Nuclear Power Station(PDF 12.6KB) 
attachment3:Nuclide analysis of radioactive materials in the air Fukushima 
            Daiichi Nuclear Power Station (Western Gate)(PDF 16.4KB) 
attachment4:Nuclide analysis of radioactive materials in the air Fukushima 
            Daini Nuclear Power Station(PDF 20.0KB) 
back to page top


to TOP