search



Corporate Information

 
Press Release (Mar 29,2011)
The results of nuclide analyses of radioactive materials in the air at the site of Fukushima Daiichi Nuclear Power Station (8th release)
On March 22nd 2011, as part of monitoring activity of the surrounding 
environment, we conducted nuclide analysis of radioactive materials 
contained in the air which were collected on March 20th and 21st 2011 at 
the site of Fukushima Daiichi Nuclear Power Station, which was damaged by 
Tohoku-Chihou-Taiheiyo-Oki Earthquake. As a result, radioactive materials 
were detected as shown in the attachment. Therefore, we summarized the 
results and reported them to Nuclear and Industry Safety Agency as well as 
to the government of Fukushima Prefecture today. (previously announced)

On March 28th, 2011, we conducted nuclide analysis of radioactive 
materials contained in the air which were collected on the same date at 
the site of Fukushima Daiichi Nuclear Power Station. As a result, 
radioactive materials were detected as shown in the attachment. Therefore, 
we summarized the results and reported them to Nuclear and Industry 
Safety Agency as well as to the government of Fukushima Prefecture today.

We will continue the sampling survey the same as this one. 
attachment1:The result of the nuclide analysis of radioactive materials in the 
            air at the site of Fukushima Daiichi Nuclear Power Station(PDF 33.3KB) 
attachment2:The result of the nuclide analysis of radioactive materials in the  
            air at the site of Fukushima Daini Nuclear Power Station(PDF 33.9KB) 
attachment3:Nuclide analysis of radioactive materials in the air 
            Fukushima Daiichi Nuclear Power Station(Western Gate)(PDF 33.1KB) 
attachment4:Nuclide analysis of radioactive materials in the air 
            Fukushima Daini Nuclear Power Station(PDF 36.5KB) 
back to page top


to TOP