search



Corporate Information

 
Press Release (Mar 28,2011)
The results of nuclide analyses of radioactive materials in the air at the site of Fukushima Daiichi Nuclear Power Station (7th release)
On March 22nd 2011, as part of monitoring activity of the surrounding 
environment, we conducted nuclide analysis of radioactive materials 
contained in the air which were collected on March 20th and 21st 2011 
at the site of Fukushima Daiichi Nuclear Power Station, which was 
damaged by Tohoku-Chihou-Taiheiyo-Oki Earthquake. As a result, 
radioactive materials were detected as shown in the attachment. 
Therefore, we summarized the results and reported them to Nuclear and 
Industry Safety Agency as well as to the government of Fukushima 
Prefecture today. (previously announced)

On March 27th, 2011, we conducted nuclide analysis of radioactive 
materials contained in the air which were collected on the same date 
at the site of Fukushima Daiichi Nuclear Power Station. As a result, 
radioactive materials were detected as shown in the attachment. 
Therefore, we summarized the results and reported them to Nuclear and 
Industry Safety Agency as well as to the government of Fukushima 
Prefecture today.

We will continue the sampling survey the same as this one. 
attachment1:The result of the nuclide analysis of radioactive materials in the 
            air at the site of Fukushima Daiichi Nuclear Power Station(PDF 33.9KB) 
attachment2:The result of the nuclide analysis of radioactive materials in the  
            air at the site of Fukushima Daini Nuclear Power Station(PDF 34.9KB) 
attachment3:Nuclide analysis of radioactive materials in the air 
            Fukushima Daiichi Nuclear Power Station(MP-1)(Main Gate)(PDF 34.1KB) 
attachment4:Nuclide analysis of radioactive materials in the air 
            Fukushima Daini Nuclear Power Station(PDF 34.0KB) 
back to page top


to TOP