On March 22nd 2011, as part of monitoring activity of the surrounding
environment, we conducted nuclide analysis of radioactive materials
contained in the air which were collected on March 20th and 21st 2011 at
the site of Fukushima Daiichi Nuclear Power Station, which was damaged by
Tohoku-Chihou-Taiheiyo-Oki Earthquake. As a result, radioactive materials
were detected as shown in the attachment. Therefore, we summarized the
results and reported them to Nuclear and Industry Safety Agency as well as
to the government of Fukushima Prefecture today. (previously announced)
On March 26th, 2011, we conducted nuclide analysis of radioactive materials
contained in the air which were collected on March 25th, 2011 at the site
of Fukushima Daiichi Nuclear Power Station. As a result, radioactive
materials were detected as shown in the attachment. Therefore, we
summarized the results and reported them to Nuclear and Industry Safety
Agency as well as to the government of Fukushima Prefecture today.
We will continue the sampling survey same as this one.
attachment1:The result of the nuclide analysis of radioactive materials in the
air at the site of Fukushima Daiichi Nuclear Power Station(PDF 34.4KB)
attachment2:The result of the nuclide analysis of radioactive materials in the
air at the site of Fukushima Daini Nuclear Power Station(PDF 34.0KB)
attachment3:Nuclide analysis of radioactive materials in the air
Fukushima Daiichi Nuclear Power Station(MP-1)(Main Gate)(PDF 34.8KB)
attachment4:Nuclide analysis of radioactive materials in the air
Fukushima Daini Nuclear Power Station(PDF 36.3KB)