Plant Status of Fukushima Daiichi Nuclear Power Station (as of 4:30 PM Mar 25th)
*new items are underlined 
All 6 units of Fukushima Daiichi Nuclear Power Station have been shut down. 
Unit 1(Shut down) 
-Reactor has been shut down. However, the explosive sound and white smoke 
 were confirmed after the big quake occurred at 3:36 pm Mar 12th. It was 
 assumed to be hydrogen explosion.
-At approximately 2:30 am on March 23rd, seawater was started to be 
 injected to the nuclear reactor through the feed water system.
-At approximately 10:50 am on March 24th, white fog-like steam arising 
 from the roof part of the reactor building was observed.
-At approximately 11:30 am on March 24th, lights in the main control room 
 was restored. 
-We had injected sea water into the reactor pressure vessel, but at 3:37 
 pm on March 25th, we have started to inject fresh water into it. 
Unit 2(Shut down) 
-At approximately 6:00 am on March 15th, an abnormal noise began emanating 
 from nearby Pressure Suppression Chamber and the pressure within this 
 chamber decreased. 
-At 6:20 pm on March 21st, white smoke was confirmed arising from the top 
 of the reactor building. As of 7:11 am on March 22nd, smoke decreased to 
 the level where we can hardly confirm
-We have been injecting sea water into the reactor pressure vessel.
 
Unit 3(Shut down) 
-Reactor has been shut down. However, the explosive sound and white smoke 
 were confirmed at 11:01am Mar 14th. It was assumed to be hydrogen explosion.
-At 8:30am on March 16th, fog like steam was confirmed arising from the 
 reactor building.
-At approximately 6:15 am on March 17th the pressure of the Suppression 
 Chamber has temporarily increased. We were preparing to implement a 
 measurement to reduce the pressure of the reactor containment vessel 
 (partial discharge of air containing radioactive material to outside) in 
 order to fully secure safety. However, at present, it is not a situation 
 to take a measure immediately to discharge air containing radioactive 
 material to outside now. We will continue to monitor the status of the 
 pressure of the reactor containment vessel.
-At approximately 4:00 pm, March 21st, light gray smoke was confirmed 
 arising from the floor roof of the Unit 3 building. On March 22nd, the 
 color of smoke changed to somewhat white and it is slowly dissipating.
-At approximately 10:45 pm on March 22nd, the light in the main control 
 room was turned on.
-At around 4:20 pm on March 23rd, our staff confirmed light black smoke 
 belching from the Unit 3 building. At approximately 11:30 pm on March 23rd 
 and 4:50 am on March 24th, our employee found no signs of smoke.
-We have been injecting sea water into the reactor pressure vessel. 
Unit 4 (outage due to regular inspection) 
-Reactor has been shut down. However, at approximately 6 am on March 15th. 
 We have confirmed the explosive sound and the sustained damage around the 
 5th floor rooftop area of the Nuclear Reactor Building.
-On March 15th and 16th, we respectively confirmed the outbreak of fire at 
 the 4th floor of the northwestern part of the Nuclear Reactor Building. 
 We immediately reported this matter to the fire department and the related 
 authorities. TEPCO employees confirmed that each fire had already died 
 down by itself. 
-At this moment, we do not consider any reactor coolant leakage inside the 
 reactor containment vessel happened. 
Unit 5 (outage due to regular inspection) 
-Reactor has been shut down and the sufficient level of reactor coolant to 
 ensure safety is maintained.
-At 5 am, March 19th, we started the Residual Heat Removal System Pump (C) 
 in order to cool the spent fuel pool.
-At this moment, we do not consider any reactor coolant leakage inside the 
 reactor containment vessel happened.
-At 2:30 pm, March 20th, the reactor achieved reactor cold shutdown. At 
 around 5:24 pm on March 23rd, when we switched the temporary Residual Heat 
 Removal System Seawater Pump, it has stopped automatically. At around 4:14 
 pm, March 24th, we started replaced pump and at around 4:35 pm, cooling of 
 reactor has restarted.
 
Unit 6 (outage due to regular inspection) 
-Reactor has been shut down and the sufficient level of reactor coolant to 
 ensure safety is maintained.
-We are working on receiving external power supply to Units 5 and 6. We 
 completed the repair work on the emergency diesel generator (A).
-At 10:14 pm, March 19th, we started the Residual Heat Removal System Pump 
 (B) of Unit 6 in order to cool the spent fuel pool.
-At this moment, we do not consider any reactor coolant leakage inside the 
 reactor containment vessel happened.
-At 7:27 pm, March 20th, the reactor achieved reactor cold shutdown. 
Today's work for cooling the spent fuel pools 
-At :05 am, March 25th, we started injecting seawater into the fuel spent 
 pool of Unit 4, using Fuel Pool Cooling and Filtering(clean up) system 
 (FPC) and finished at 10:20 am. At 10:30 am, March 25th, we started 
 injecting seawater into the spent fuel pool of Unit 2, using Fuel Pool 
 Cooling and Filtering (clean up) system (FPC) and finished it at 0:19 pm 
 of the same day. 
-Spraying at the spent fuel pool of Unit 3 by Kawasaki City Fire Department 
 was carried out from 1:28 pm to 4:00 pm on March 25th. 
-We are considering further spraying at other units and others subject to 
 the conditions of spent fuel pools. 
Casualty 
-2 workers of cooperative firm were injured at the occurrence of the 
 earthquake, and were transported to the hospital on March 11th.
-4 workers were injured and transported to the hospital after explosive 
 sound and white smoke were confirmed around the Unit 1on March 11th.
-Presence of 2 TEPCO employees at the site is not confirmed on March 11th.
-1 TEPCO employee who was not able to stand by his own holding left chest 
 with his hand, was transported to the hospital by an ambulance on March 
 12th.
-1 subcontract worker at the key earthquake-proof building was unconscious
 and transported to the hospital by an ambulance on March 12th.
-The radiation exposure of 1 TEPCO employee, who was working inside the 
 reactor building, exceeded 100mSv and he was transported to the hospital 
 on March 12th.
-2 TEPCO employees felt bad during their operation in the central control 
 rooms of Unit 1 and 2 while wearing full masks, and were transferred to 
 Fukushima Daini Nuclear Power Station for consultation with a medical 
 advisor on March 13th.
-11 workers were injured and transported to Fukushima Daini Nuclear Power 
 Station etc. after explosive sound and white smoke were confirmed around 
 the Unit 3. One of the workers was transported to the FUKUSHIMA Medical 
 University Hospital on March 14th.
-At approximately 10 pm on March 22nd, 1 worker who had been working on 
 setting up a temporary power panel in the common pool was injured and 
 transported to Fukushima Daini Nuclear Power Station where the industrial 
 doctor is.
-At approximately 1 am on March 23rd, 1 worker who had been working on 
 transporting a temporary power panel in the common pool was injured and 
 transported to Fukushima Daini Nuclear Power Station where the industrial 
 doctor is.
-On March 24th, it was confirmed that 3 workers from cooperative companies 
 who were in charge of cable laying work in the 1st floor and the 
 underground floor of turbine building were exposed to the radiation dose 
 of more than 170 mSv. 2 of them were confirmed that their leg skin were 
 contaminated. Although they were decontaminated, since it there were 
 possibility of beta ray burn injury, they were transferred to Fukushima 
 Medical University Hospital. The third worker was also transferred to 
 Fukushima Medical University Hospital today (March 25). The 3 workers are 
 now been transferred to National Institute of Radiological Sciences in 
 Chiba Prefecture.
 Regarding this event, TEPCO has reported to related government ministries 
 and agencies on measures to be taken to assure appropriate radiation dose 
 control and radiation exposure related operations.
 Before today's restoration work, we will make notification to the 
 concerned parties and continue to take all possible measures to future 
 management. 
Others 
-We measured radioactive materials (iodine etc.) inside of the nuclear 
 power station area (outdoor) by monitoring car and confirmed that 
 radioactive materials level is getting higher than ordinary level. As 
 listed below, we have determined that specific incidents stipulated in 
 article 15, clause 1 of Act on Special Measures Concerning Nuclear 
 Emergency Preparedness (Abnormal increase in radiation dose measured at 
 site boundary) have occurred.
 ·Determined at 4:17 pm Mar 12th (Around Monitoring Post 4 )
 ·Determined at 8:56 am Mar 13th (Around Monitoring Post 4 )
 ·Determined at 2:15 pm Mar 13th (Around Monitoring Post 4 )
 ·Determined at 3:50 am Mar 14th (Around Monitoring Post 6 )
 ·Determined at 4:15 am Mar 14th (Around Monitoring Post 2 ) 
 ·Determined at 9:27 am Mar 14th (Around Monitoring Post 3 ) 
 ·Determined at 9:37 pm Mar 14th (Around main entrance ) 
 ·Determined at 6:51 am Mar 15th (Around main entrance ) 
 ·Determined at 8:11 am Mar 15th (Around main entrance ) 
 ·Determined at 4:17 pm Mar 15th (Around main entrance ) 
 ·Determined at 11:05 pm Mar 15th (Around main entrance )
 ·Determined at 8:58 am Mar 19th (Around MP5)
From now on, if the measured figure fluctuates and goes above and below 500 
micro Sv/h, we deem that as the continuous same event and will not regard 
that as a new specific incidents stipulated in article 15, clause 1 of the 
Act on Special Measures Concerning Nuclear Emergency Preparedness (Abnormal 
increase in radiation dose measured at site boundary) has occurred. In the 
interim, if we measure a manifestly abnormal figure and it is evident that 
the event is not the continuous same event, we will determine and notify.

-The national government has instructed evacuation for those local 
 residents within 20km radius of the periphery and evacuation to inside for 
 those residents from 20km to 30km radius of the periphery, because it's 
 possible that radioactive materials are discharged.
-At approximately 10am on March 15th, we observed 400mSv/h at the inland 
 side of the Unit 3 reactor building and 100mSv/h at the inland side of 
 the Unit 4 reactor building.
-At around 10:37 am March 21st, water spraying to common spent fuel pool 
 and finished at 3:30 pm (conducted by TEPCO).
-At around 3:37 pm, March 24th, electricity supply to common spent fuel 
 pool has started from external power source. At around 6:05 pm, fuel pool 
 cooling pump was started to cool the pool.
-We found no signs of abnormal situation for the casks by visual 
 observation during the patrol activity. A detailed inspection is under 
 preparation.
-At Units 5 and 6, in order to prevent hydrogen gas from accumulating 
 within the buildings, we have made three holes on the roof of the reactor 
 building for each unit.
-In total 12 fire engines are lent for the water spraying to the spent fuel 
 pools and water injection to the nuclear reactors by various regional fire 
 departments* as well as Tokyo Fire Department. Also, instruction regarding 
 the setting and operation of large scale decontamination system was 
 provided by Niigata City Fire Headquarter and Hamamatsu City Fire 
 Headquarter.
*: Koriyama Fire Department, Iwaki Fire Brigade Headquarters, Fire 
   Headquarters of Sukagawa District Wide Area Fire-fighting Association, 
   Yonezawa City Fire Headquarters, Utsunomiya City Fire Headquarters, Fire 
   Headquarters of Aizu-Wakamatsu wide area municipal association, Saitama 
   City Fire Bureau, and Niigata City Fire Bureau.
-Until March 22nd, Units 1 through 6 were started to be energized from the 
 external power source.
-We will continue to take all measures to ensure the safety and to continue 
 monitoring the surrounding environment around the Power Station. 