On March 22nd 2011, as part of monitoring activity of the surrounding
environment, we conducted nuclide analysis of radioactive materials
contained in the air which were collected on March 20th and 21st 2011
at the site of Fukushima Daiichi Nuclear Power Station, which was
damaged by Tohoku-Chihou-Taiheiyo-Oki Earthquake. As a result,
radioactive materials were detected as shown in the attachment.
Therefore, we summarized the results and reported them to Nuclear and
Industry Safety Agency as well as to the government of Fukushima
Prefecture today. (previously announced)
On March 24th, 2011, we conducted nuclide analysis of radioactive
materials contained in the air which were collected on March 24th,
2011 at the site of Fukushima Daiichi Nuclear Power Station. As a
result, radioactive materials were detected as shown in the
attachment. Therefore, we summarized the results and reported them
to Nuclear and Industry Safety Agency as well as to the government
of Fukushima Prefecture today.
We will continue the sampling survey same as this one.
attachment1:The result of the nuclide analysis of radioactive materials in the
air at the site of Fukushima Daiichi Nuclear Power Station(PDF 64.0KB)
attachment2:The result of the nuclide analysis of radioactive materials in the
air at the site of Fukushima Daini Nuclear Power Station(PDF 54.0KB)
attachment3:Nuclide analysis of radioactive materials in the air Fukushima Daiichi
uclear Power Station(Main Gate) (PDF 10.5KB)
attachment4:Nuclide analysis of radioactive materials in the air Fukushima Daini
Nuclear Power Station(MP-1)(PDF 12.8KB)