Unit   Status
1    · Reactor cold shutdown, stable water level, offsite power is
       available.
     · No cooling water is leaked to the reactor containment vessel.
     · Maintain average water temperature below 100°C in the pressure
       restraint.
2    · Reactor cold shutdown, stable water level, offsite power is
       available.
     · No cooling water is leaked to the reactor containment vessel.
     · Maintain average water temperature below 100°C in the pressure
       restraint.
3    · Reactor cold shutdown, stable water level, offsite power is
       available.
     · No cooling water is leaked to the reactor containment vessel.
     · Maintain average water temperature below 100°C in the pressure
       restraint.
4    · Reactor cold shutdown, stable water level, offsite power is
       available.
     · No cooling water is leaked to the reactor containment vessel.
     · Maintain average water temperature below 100°C in the pressure
       restraint.

other  N.A.

The next information in regard to the plant is planned to be released
at 9:00 pm, 20th March. 