Press Release (Mar 20,2011)
Plant Status of Fukushima Daini Nuclear Power Station (as of 9:00 am March 20th)
No New Developments since 9:00pm, 19th March

Unit   Status
1     · Reactor cold shutdown, stable water level, offsite power is 
        available.
      · No cooling water is leaked to the reactor containment vessel.
      · Maintain average water temperature below 100°C in the pressure 
        restraint.
2     · Reactor cold shutdown, stable water level, offsite power is 
        available.
      · No cooling water is leaked to the reactor containment vessel.
      · Maintain average water temperature below 100°C in the pressure 
        restraint.
3     · Reactor cold shutdown, stable water level, offsite power is 
        available.
      · No cooling water is leaked to the reactor containment vessel.
      · Maintain average water temperature below 100°C in the pressure 
        restraint.
4     · Reactor cold shutdown, stable water level, offsite power is 
        available.
      · No cooling water is leaked to the reactor containment vessel.
      · Maintain average water temperature below 100°C in the pressure 
        restraint. 
other N.A.

The next information in regard to the plant is planned to be released 
at 0:00 pm, 20th March. 