search



Corporate Information

 
Press Release (Mar 19,2011)
Plant Status of Fukushima Daini Nuclear Power Station (as of 0:00 pm March 19th)
No New Developments since 9:00pm, 19th March

Unit   Status
1    • Reactor cold shutdown, stable water level, offsite power is 
       available.
     • No cooling water is leaked to the reactor containment vessel.
     • Maintain average water temperature below 100°C in the pressure 
       restraint.
2    • Reactor cold shutdown, stable water level, offsite power is 
       available.
     • No cooling water is leaked to the reactor containment vessel.
     • Maintain average water temperature below 100°C in the pressure 
       restraint.
3    • Reactor cold shutdown, stable water level, offsite power is 
       available.
     • No cooling water is leaked to the reactor containment vessel.
     • Maintain average water temperature below 100°C in the pressure 
       restraint.
4    • Reactor cold shutdown, stable water level, offsite power is 
       available.
     • No cooling water is leaked to the reactor containment vessel.
     • Maintain average water temperature below 100°C in the pressure 
       restraint.   
other• In the Unit 1, 2, 3 and 4, which automatically shut down due 
       to the Tohoku-Chihou-Taiheiyo-Oki Earthquake on March 11th, 2011, 
       we had been preparing measures for decreasing the pressure of each
       reactor containment vessel since March 12th. However, on March 
       17th, we released such preparation in all of the Units. 
back to page top


to TOP