*new items are underlined
All 6 units of Fukushima Daiichi Nuclear Power Station have been shut down.
Unit 1 (Shut down)
- Reactor has been shut down. However, the explosive sound and white smoke
were confirmed after the big quake occurred at 3:36PM Mar 12th. It was
assumed to be hydrogen explosion.
- We have been injecting sea water into the reactor pressure vessel.
Unit 2 (Shut down)
- Reactor has been shut down and the level of reactor coolant had dropped
and the reactor pressure had increased because the Reactor Core
Isolation Cooling System stopped. Measures were taken to lower the
pressure within the Reactor Containment Vessel and to inject sea water
into the Reactor while carefully confirming safety. The level of reactor
coolant and the pressure of the Reactor resumed.
- At approximately 6:00AM on March 15, 2011, an abnormal noise began
emanating from nearby Pressure Suppression Chamber and the pressure
within this chamber decreased.
- We completed receiving electricity from the external transmission line
up to the auxiliary transformer. We are installing the power cable from
that transformer to the temporary power panel.
- We have been injecting sea water into the reactor pressure vessel.
Unit 3 (Shut down)
- Reactor has been shut down. However, the explosive sound and white smoke
were confirmed at 11:01AM Mar 14th. It was assumed to be hydrogen
explosion.
- At 8:30AM on March 16th, fog like steam was confirmed arising from the
reactor building.
- At approximately 6:15AM on March 17th the pressure of the Suppression
Chamber has temporarily increased.
- We are working on receiving external power supply to Units 3 and 4.
- We have been injecting sea water into the reactor pressure vessel.
Unit 4 (outage due to regular inspection)
- Reactor has been shut down. However, at approximately 6AM on March 15th.
We have confirmed the explosive sound and the sustained damage around
the 5th floor rooftop area of the Nuclear Reactor Building.
- On March 15th and 16th, we respectively confirmed the outbreak of fire
at the 4th floor of the northwestern part of the Nuclear Reactor
Building. We immediately reported this matter to the fire department and
the related authorities. TEPCO employees confirmed that each fire had
already died down by itself.
- At this moment, we do not consider any reactor coolant leakage inside
the reactor containment vessel happened.
Unit 5 (outage due to regular inspection)
- Reactor has been shut down and the sufficient level of reactor coolant
to ensure safety is maintained.
- At 5 AM, Mar 19th, we started the Residual Heat Removal System Pump (C )
in order to cool the spent fuel pool.
- At this moment, we do not consider any reactor coolant leakage inside
the reactor containment vessel happened.
Unit 6 (outage due to regular inspection)
- Reactor has been shut down and the sufficient level of reactor coolant
to ensure safety is maintained.
- We are working on receiving external power supply to Units 5 and 6. We
completed the repair work on the emergency diesel generator (A).
- At this moment, we do not consider any reactor coolant leakage inside
the reactor containment vessel happened.
Cooling of spent fuel pools
- In Unit 3, water discharge by Self-Defense Force's helicopters was
conducted from 9:48 AM in the morning on March 17th. Also water
discharge by the riot police's high-pressure water cannon trucks and
Self-Defense Force's fire engines was conducted from 7PM on March 17th
and finished at 8:09PM.
- In Unit 3, water discharge by Self-Defense Force's fire engines and US
army's fire engines was conducted from 2 PM and completed a quarter to
3 PM.
- After that, from 0:30 AM, Mar 19th, water discharge by Tokyo Fire
Department's Hyper Rescue was conducted and completed at 1:10 AM.
- We are considering further water discharge at Unit 3 and others subject
to the conditions of spent fuel pools.
Casualty
- 2 workers of cooperative firm were injured at the occurrence of the
earthquake, and were transported to the hospital.
- 1 TEPCO employee who was not able to stand by his own holding left chest
with his hand, was transported to the hospital by an ambulance.
- 1 subcontract worker at the key earthquake-proof building was
unconscious and transported to the hospital by an ambulance.
- The radiation exposure of 1 TEPCO employee, who was working inside the
reactor building, exceeded 100mSv and he was transported to the hospital.
- 2 TEPCO employees felt bad during their operation in the central control
rooms of Unit 1 and 2 while wearing full masks, and were transferred to
Fukushima Daini Power Station for consultation with a medical advisor.
- 4 workers were injured and transported to the hospital after explosive
sound and white smoke were confirmed around the Unit 1.
- 11 workers were injured and transported to Fukushima Daini Nuclear Power
Station etc. after explosive sound and white smoke were confirmed around
the Unit 3.One of the workers was transported to the FUKUSHIMA Medical
University Hospital at 10:56AM
- Presence of 2 TEPCO employees at the site is not confirmed.
Others
- We measured radioactive materials (iodine etc.) inside of the nuclear
power station area (outdoor) by monitoring car and confirmed that
radioactive materials level is getting higher than ordinary level. As
listed below, we have determined that specific incidents stipulated in
article 15, clause 1 of Act on Special Measures Concerning Nuclear
Emergency Preparedness (Abnormal increase in radiation dose measured at
site boundary) have occurred.
·Determined at 4:17 PM Mar 12th (Around Monitoring Post 4 )
·Determined at 8:56 AM Mar 13th (Around Monitoring Post 4 )
·Determined at 2:15 PM Mar 13th (Around Monitoring Post 4 )
·Determined at 3:50 AM Mar 14th (Around Monitoring Post 6 )
·Determined at 4:15 AM Mar 14th (Around Monitoring Post 2 )
·Determined at 9:27 AM Mar 14th (Around Monitoring Post 3 )
·Determined at 9:37 PM Mar 14th (Around main entrance )
·Determined at 6:51 AM Mar 15th (Around main entrance )
·Determined at 8:11 AM Mar 15th (Around main entrance )
·Determined at 4:17 PM Mar 15th (Around main entrance )
·Determined at 11:05 PM Mar 15th (Around main entrance )
·Determined at 8:58 AM Mar 19th (Around MP5)
From now on, if the measured figure fluctuates and goes above and below
500 micro Sv/h, we deem that as the continuous same event and will not
regard that as a new specific incidents stipulated in article 15, clause
1 of the Act on Special Measures Concerning Nuclear Emergency
Preparedness (Abnormal increase in radiation dose measured at site
boundary) has occurred. In the interim, if we measure a manifestly
abnormal figure and it is evident that the event is not the continuous
same event, we will determine and notify.
- The national government has instructed evacuation for those local
residents within 20km radius of the periphery and evacuation to inside
for those residents from 20km to 30km radius of the periphery, because
it's possible that radioactive materials are discharged.
- At approximately 10AM on March 15th, we observed 400mSv/h at the inland
side of the Unit 3 reactor building and 100mSv/h at the inland side of
the Unit 4 reactor building.
- We checked the status of spent fuel in the common pool, and confirmed
that the water level secured. We are planning to conduct a detailed
inspection.
- We found no signs of abnormal situation for the casks by visual
observation during the patrol activity. A detailed inspection is under
preparation.
- At Units 5 and 6, in order to prevent hydrogen gas from accumulating
within the buildings, we have made three holes on the roof of the
reactor building for each unit
- We will continue to take all measures to ensure the safety and to
continue monitoring the surrounding environment around the Power Station.