Press Release (Dec 09,2010)
Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of December 9)
We are announcing the status of major inspections and restoration works 
and non conformances at TEPCO's Kashiwazaki-Kariwa Nuclear Power Station 
after the Niigata-Chuetsu-Oki Earthquake. 

Inspection/ Restoration Status 

 ◇ Inspection and restoration completed between December 3 to December 
    9, 2010 
    (Completed on the following date) 

   - Unit 3 Turbine inspection (High-pressure turbine and low-pressure 
     turbine (A) (B) (C) detailed inspection and restoration work):
       December 8 

   - Unit 5 Functional test for the entire plant (Inspection after 
     generating power at 100% of the rated output): 
       December 3 

   - Unit 5 Functional test for the entire plant (Inspection after 
     reaching rated thermal output): 
       December 7 

   - Unit 5 Functional test for the entire plant (Functional test for 
     reactor core isolation cooling system (RCIC)): 
       December 8 

 ◇ Inspection and restoration to be commenced between December 10 to 
    December 16, 2010 
    (To be commenced on the following date) 

   - Unit 3 System functional test (Functional test of automatic 
     depressurization system):
       December 10 

 ◇ Work Schedule of Major Inspection and Restoration from December 5, 
    2010 to January 1, 2011 

   - Work Schedule of the Main Inspection/ Restoration of the Kashiwazaki-
     Kariwa Nuclear Power Station in Response to the Niigata-Chuetsu-Oki 
     Earthquake (during 4 Weeks)                               ...Appendix

(Reference) 
Nonconformances Found in the Inspection and Restoration Works Performed 
after the Niigata-Chuetsu-Oki Earthquake

 Based on the "Public Announcement Regarding Nonconformance Found in the 
 Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki 
 Earthquake," the Tokyo Electric Power Company, Incorporated (TEPCO) 
 provides this announcement containing incidents information reported from 
 December 2 to December 8, 2010. 

 ◇ Incidents Information (relating to the Chuetsu-Oki Earthquake)
Incidents Information (relating to the Chuetsu-Oki Earthquake)
<Reports from December 2 to December 8, 2010>
Reports from December 2 to December 8, 2010
◇ Other Findings - Information on Nonconformances (those related to: the Chuetsu-Oki Earthquake; Grades GI, GII, GIII; and non-graded) (including nonconformances related to: the Chuetsu-Oki Earthquake; Grades As, A, B, C, D; and non-graded)
Other Findings
* By close reexamination of past nonconformance incidents, 1 of them is identified as not related to the Chuetsu-Oki Earthquake, so the total number of them has been corrected. - We are making every effort to carry on inspections and restoration works at the Kashiwazaki-Kariwa Nuclear Power Station after the Niigata-Chuetsu-Oki Earthquake. In addition to this, we will implement the inspection of heating ventilation and air-conditioning system ducts which are placed inside and outside of Unit 2, Unit 3 and Unit 4, in the light of fact that air leakage from outdoor air-conditioning duct (main body) and penetration part of outdoor air-conditioning duct building was found at the Fukushima Daiichi Nuclear Power Station. We will perform the inspection for about 2 months from December 13, 2010.
Appendix: Work Schedule of the Main Inspection/ Restoration of the Kashiwazaki- 
          Kariwa Nuclear Power Station in Response to the Niigata-Chuetsu-Oki
          Earthquake (during 4 Weeks) (PDF 91.9KB)