Press Release (Jan 15,2009)
Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of January 15th)
We are announcing the status of major inspections and restoration works and nonconformances 
at TEPCO's Kashiwazaki-Kariwa Nuclear Power Station after the Niigata-Chuetsu-Oki Earthquake. 

Inspection/Restoration Status

 ○ Inspection and restoration completed between January 9th to January 15, 2009 
    (Completed on the following date) 

   • Unit No.6 Reactor internal pump input transformer inspection (Installation work): 
      January 10th 
   • Unit No.6 Reactor internal pump input transformer inspection (Electrical testing): 
      January 10th 
   • Unit No.6 Seismic reinforcement works (Seismic reinforcement works for reactor 
     building overhead crane): 
      January 12th 

 ○ Inspection and restoration to be commenced between January 16th to January 22nd, 2009 
    (To be commenced on the following date)  

   • Unit No.1 Seismic reinforcement works (Seismic reinforcement works for the roof 
     truss of the reactor building): 
      January 21st 
   • Unit No.1 Seismic reinforcement works (Foundation improvement work for emergency 
     intake channel): 
      January 19th 
   • Unit No.5 Seismic reinforcement works (Seismic reinforcement works for the roof 
     truss of the reactor building): 
      January 19th
   • Unit No.6 Reactor head opening (Restoration work of blades of low-pressure turbine): 
      January 21st 
   • High-voltage start-up transformer #2 inspection (Inspection): 
      January 19th 
   • Restoration work for solid waste storage facility (Prevention countermeasure for 
     drum falling): 
      January 16th 

 ○ Work Schedule of Major Inspection/Restoration from January 11th to February 7th, 2009

   • Work Schedule of the Main Inspection/Restoration of the Kashiwazaki-Kariwa Nuclear 
     Power Station in Response to the Niigata-Chuetsu-Oki Earthquake (during 4 Weeks)
                                                                           ....Appendix 

 (Reference) 
  Nonconformances Found in the Inspection and Restoration Works Performed after the 
  Niigata-Chuetsu-Oki Earthquake

  Based on the "Public Announcement Regarding Nonconformance Found in the Inspection 
  and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake", the Tokyo 
  Electric Power Company, Incorporated (TEPCO) provides this announcement containing 
  incidents information reported from January 8th to January 14th, 2009. 

 ○ Incidents Information (relating to the Chuetsu-Oki Earthquake) 
Incidents Information (relating to the Chuetsu-Oki Earthquake)
< Reports from January 8 to January 14, 2009 >
Reports from January 8 to January 14, 2009
○ Other Findings • Information on Nonconformances (those related to: the Chuetsu-Oki Earthquake; Grades As, A, B, C, D; and non-graded)
* Numbers were corrected to reflect nonconformance incidents that had been identified as not related to the Chuetsu-Oki Earthquake (7 cases) and that had been double-counted (1 case). • We sincerely acknowledge the instructions and requests from various institutions and will do our best to prevent recurrence of events by increasing the level of safety consciousness together with cooperating companies. We sincerely apologize for causing anxiety to local residents due to the fires that broke out at the turbine building of TEPCO's Kashiwazaki-Kariwa NPS Unit No.7 on November 22nd, 2008 and at the turbine building of Unit No.6 on December 8th, 2008. As for these two fires, we have reported the root cause analysis and recurrence prevention measures of each case to the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry, and we are earnestly carrying out this recurrence prevention measures. We sincerely acknowledge the instructions and requests from various institutions and will do our best to prevent recurrence of events by increasing the level of safety consciousness together with cooperating companies. • The number 3 solid waste storage building that begun construction on April 2008 was completed on December 25th, 2008 and was designated as radiation protection area on January 13th, 2009. The construction of the number 3 building had been planned prior to the occurrence of the Niigata Chuetsu-Oki earthquake with the intention to expand the storage capacity of drums up to a total of 45,000 permitted by the regulatory agency at the time of the establishment permit of the Kashiwazaki Kariwa NPS. By the end of 2006, the number of drums had reached 21,700 or 70% of the total storage capacity of 30,000 of the existing storage buildings number 1 and 2. With the completion of building number 3, a total of 45,000 drums can now be stored at the site. Based on a study of storage method of drums that is resistant to seismic motion, we have decided to use rack-type storage containers in addition to box pallets currently used in the interim storage facility. We plan to relocate currently stored drums and newly generated drums to box pallets and rack-type storage containers in the next 1 year.
Appendix: Work Schedule of the Main Inspection/Restoration of the Kashiwazaki-Kariwa Nuclear 
          Power Station in Response to the Niigata-Chuetsu-Oki Earthquake (during 4 Weeks) 
                                                                                (PDF 94.2KB) 