Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 18th)
We are announcing the status of major inspections and restoration works and 
nonconformances at TEPCO's Kashiwazaki-Kariwa Nuclear Power Station after the 
Niigata-Chuetsu-Oki Earthquake. 

Inspection/Restoration Status

 ○ Inspection and restoration completed between September 12th to September 18th, 2008 
    (Completed on the following date) 

   • Unit No.7 House transformer inspection (7A and 7B Installation work): 
      September 12th 

 ○ Inspection and restoration to be commenced between September 19th to September 25th, 2008 
    (To be commenced on the following date) 

   • Unit No.6 Seismic reinforcement work (Preparation for seismic reinforcement works for 
     reactor building ceiling crane): 
      September 21st 
   • Unit No.7 System functional test (Functional test for the reactor containment vessel 
     spray system): 
      September 18th*
   • Unit No.7 System functional test (Interlock functional test for liquid waste storage 
     facility and disposal equipment): 
      September 19th 
   • Unit No.7 System functional test (Functional test for DC power source system): 
      September 24th
                                                            * Work schedules added this week.

 ○ Work Schedule of Major Inspection/Restoration from September 14th to October 11th, 2008

    • Work Schedule of the Main Inspection/Restoration of the Kashiwazaki-Kariwa Nuclear 
      Power Station in Response to the Niigata-Chuetsu-Oki Earthquake (during 4 Weeks)
                                                                            ....Appendix

 (Reference) 
   Nonconformances Found in the Inspection and Restoration Works Performed after the 
   Niigata-Chuetsu-Oki Earthquake

   Based on the "Public Announcement Regarding Nonconformance Found in the Inspection 
   and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake", the Tokyo 
   Electric Power Company, Incorporated (TEPCO) provides this announcement containing 
   incidents information reported from September 11th to September 17th, 2008. 

  ○ Incidents Information (relating to the Chuetsu-Oki Earthquake)
Incidents Information (relating to the Chuetsu-Oki Earthquake)
< Reports from September 11 to September 17, 2008>
Reports from September 11 to September 17, 2008
○ Other Findings Nothing to disclose this week.
Appendix: Work Schedule of the Main Inspection/Restoration of the Kashiwazaki-Kariwa Nuclear
          Power Station in Response to the Niigata-Chuetsu-Oki Earthquake (during 4 Weeks)
                                                                                (PDF 40.3KB)