September 29, 2004
Tokyo-----Tokyo Electric Power Co. (TEPCO) today announced that TEPCO
started to shut down the No.2 reactor at the Fukushima Dai-ichi nuclear
power station (Boiling-water reactor [BWR], rated output of 784 MW) manually
from 5:30pm on Sep.29. This is to check two reactor recirculation pumps.
|