18Impact assessments of tornadoes
and countermeasures
Design basis target facility(prevention of major accidents)

Requirements from the New Regulatory Requirements
Safety functions should not be impaired by the impact of tornadoes.
Actions taken at the Kashiwazaki-Kariwa Nuclear Power Station
The maximum wind speed of a tornado for design was revised from the standard setting of 76 meters per second to 92 meters per second,
 in consideration of future climate changes.
Protective measures are being implemented for equipment (reactor building openings, outdoor equipment, etc.)
 that from a design viewpoint will likely be affected by a tornado.

TEPCO

18Impact assessments of tornadoes and countermeasures Design basis target facility(prevention of major accidents)

Requirements from the New Regulatory Requirements
Safety functions should not be impaired by the impact of tornadoes.
Actions taken at the Kashiwazaki-Kariwa Nuclear Power Station
The maximum wind speed of a tornado for design was revised from the standard setting of 76 meters per second to 92 meters per second, in consideration of future climate changes.
Protective measures are being implemented for equipment (reactor building openings, outdoor equipment, etc.) that from a design viewpoint will likely be affected by a tornado.