15Impact assessments of external fires
and countermeasures
Design basis target facility(prevention of major accidents)

Requirements from the New Regulatory Requirements
Safety functions should not be impaired by fires or blasts occurring outside of the power station such as forest fires, fires or explosions from nearby factories, or plane crashes.
Actions taken at the Kashiwazaki-Kariwa Nuclear Power Station
Impact assessments were conducted to confirm that the necessary functions are not impaired in the event of a fire outside of the power station.
Spread of fire will be prevented by constructing a fire line around the nuclear facilities.
The preventive water sprinkling plans were established and the self-defence fire brigade is stationed 24 hours a day.

TEPCO

15Impact assessments of external fires and countermeasures Design basis target facility(prevention of major accidents)

Requirements from the New Regulatory Requirements
Safety functions should not be impaired by fires or blasts occurring outside of the power station such as forest fires, fires or explosions from nearby factories, or plane crashes.
Actions taken at the Kashiwazaki-Kariwa Nuclear Power Station
Impact assessments were conducted to confirm that the necessary functions are not impaired in the event of a fire outside of the power station.
Spread of fire will be prevented by constructing a fire line around the nuclear facilities.
The preventive water sprinkling plans were established and the self-defence fire brigade is stationed 24 hours a day.