TEPCO

13Filter vents Major accident response facilities (response to major accidents)

Requirements from the New Regulatory Requirements
Measures to decrease the pressure and temperature of the Primary Containment Vessel in the event of core damage should be installed.
Actions taken at the Kashiwazaki-Kariwa Nuclear Power Station
To prevent Primary Containment Vessel failure, an alternative circulating cooling system was installed. A filter vent system was installed as a further measure.

TEPCO

13Filter vents Major accident response facilities (response to major accidents)

Requirements from the New Regulatory Requirements
Measures to decrease the pressure and temperature of the Primary Containment Vessel in the event of core damage should be installed.
Actions taken at the Kashiwazaki-Kariwa Nuclear Power Station
To prevent Primary Containment Vessel failure, an alternative circulating cooling system was installed. A filter vent system was installed as a further measure.