○Information
○Measurement value list : 2023/09/10(CSV Download)
| Time | ALPS treated water transfer line (A) flow rate -1 | ALPS treated water transfer line (A) flow rate -2 | ALPS treated water transfer line (B) flow rate -1 | ALPS treated water transfer line (B) flow rate -2 | Total ALPS treated water transfer line volume (A) | Total ALPS treated water transfer line volume (B) | ALPS treated water transfer pump (A) | ALPS treated water transfer pump (B) |
| 00:00 | 18.96 | 18.99 | 0 | 0 | 7480 | 0 | In operation | Stopped |
| 01:00 | 18.93 | 18.96 | 0 | 0 | 7499 | 0 | In operation | Stopped |
| 02:00 | 19.01 | 19.04 | 0 | 0 | 7518 | 0 | In operation | Stopped |
| 03:00 | 18.93 | 18.96 | 0 | 0 | 7537 | 0 | In operation | Stopped |
| 04:00 | 18.97 | 19 | 0 | 0 | 7556 | 0 | In operation | Stopped |
| 05:00 | 18.88 | 18.91 | 0 | 0 | 7575 | 0 | In operation | Stopped |
| 06:00 | 18.91 | 18.94 | 0 | 0 | 7594 | 0 | In operation | Stopped |
| 07:00 | 18.96 | 18.99 | 0 | 0 | 7613 | 0 | In operation | Stopped |
| 08:00 | 18.86 | 18.9 | 0 | 0 | 7632 | 0 | In operation | Stopped |
| 09:00 | 19.03 | 19.05 | 0 | 0 | 7651 | 0 | In operation | Stopped |
| 10:00 | 19.04 | 19.05 | 0 | 0 | 7670 | 0 | In operation | Stopped |
| 11:00 | 18.93 | 18.95 | 0 | 0 | 7689 | 0 | In operation | Stopped |
| 12:00 | 19.02 | 19.03 | 0 | 0 | 7708 | 0 | In operation | Stopped |
| 13:00 | 18.88 | 18.91 | 0 | 0 | 7727 | 0 | In operation | Stopped |
| 14:00 | 18.9 | 18.93 | 0 | 0 | 7746 | 0 | In operation | Stopped |
| 15:00 | 0 | 0 | 0 | 0 | 7762 | 0 | Stopped | Stopped |
| 16:00 | 0 | 0 | 0 | 0 | 7762 | 0 | Stopped | Stopped |
| 17:00 | 0 | 0 | 0 | 0 | 7762 | 0 | Stopped | Stopped |
| 18:00 | 0 | 0 | 0 | 0 | 7762 | 0 | Stopped | Stopped |
| 19:00 | 0 | 0 | 0 | 0 | 7762 | 0 | Stopped | Stopped |
| 20:00 | 0 | 0 | 0 | 0 | 7762 | 0 | Stopped | Stopped |
| 21:00 | 0 | 0 | 0 | 0 | 7762 | 0 | Stopped | Stopped |
| 22:00 | 0 | 0 | 0 | 0 | 7762 | 0 | Stopped | Stopped |
| 23:00 | 0 | 0 | 0 | 0 | 7762 | 0 | Stopped | Stopped |